The brief
Refresh the façade of a 2008 business centre and bring it up to current fire-safety requirements without interrupting tenants.
The solution
A ventilated system of A2-class composite cassettes on an aluminum substructure, with wind-load calculations and a full tender document package.
Materials
4 mm composite cassettes with a non-combustible core, an aluminum L-profile and bracket substructure, EPDM seals.
Timeline
Survey and design - 10 days, cassette production - 18 days, installation by two crews - 14 days.